The PACE team provided planning, coordination, and conceptual design of approximately 5,700 feet of water main replacement at 11 different sites associated with a city-wide AC pipe replacement program. City as-builts, WSDOT permits, assessor records, GIS data, and other sources were used to determine the existing waterline location and associated easements. During the planning phase, we assisted the contractor with coordinating potholing efforts.