Olympus Lift Station

PACE prepared the civil design to relocate and upsize the Olympus Lift Station to accommodate build-out flows within the service area. The project included a new custom-designed wet well/dry well station and the upsizing of 2,500 LF of existing force main to 12 inches. PACE conducted hydraulic studies and models to simulate flow through the station.