North Creek Levees

Development upstream of North Creek caused revision to the 100-year flows and the levees needed to be raised to meet new flow projections. Bridge and wingwall improvements were made at three bridge crossings and a flood wall was constructed to contain flood waters from a backwater area. PACE provided civil and structural design plans and specifications, construction inspection services, land surveying, as-built drawings, and a maintenance and operations manual.