Pump Station
No. 25

Pump Station No. 25 was in need of major upgrades to protect the adjacent properties and structures from flooding. PACE evaluated options to address the flooding, provided a complete topographic and boundary survey, and assisted with neighborhood outreach. The city selected a complete new submersible pump station with telemetry and utilized the existing pond for infiltration at the lower storm events.